Sunday, November 23, 2008

remodeling the batroom

Robyn and I agreed to go serious when repairing a room. We started with the second bathroom. We had to replace the floor and the shower to make it functional again, so why B.S.? We got the floor we wanted, the shower we wanted, and the vanity we wanted. We also got a ton of headache we didn't want.

We realized the ceiling had to come down this weekend before we could go much further. The walls had to be I was careful to cover vents and drains before I started.

I should have known just from the sheer amount of leaves and twigs that fell there would be an issue, but I trudged on anyway.

The leaves and remnants of shingle gravel didn't bother me, but the bat's nest I found troubled me a bit, especially the one that dropped on my head. It wasn't until much later that evening, I realized my life plays out like a sitcom.

We went with sheet rock on the ceilings. I think the flat painted ceiling will add a level of class that blown acoustic mess and those dated tiles just can't match.

The next thing to tackle is the draftiness, the weak output of the furnace, and the second bathroom.

No comments: